Ben Kegler's Apartment
65 Sefton Drive
New Britain, CT 06050
Case DetailsCase Number: SPR-S14-002
Case Manager: Jason Bristol Location: 65 Sefton Drive Date: 04/24/14 Conclusion: Inconclusive Parties Present
Evidence |
ResearchNo information was readily available about the property other than that it was built in 1928. Ben informed us however that there was supposedly a fire in the basement a little over ten years ago, and that previous tenants reported things like objects moving off of the counter tops and hearing noises.
InvestigationThe Investigation began at around 10:20 pm and lasted around two hours. The property consisted of three main floors, two balconies, and a basement. Our investigation occurred on the second and third floor, as well as the basement. Both balconies were not easily accessible, and the first floor was occupied by another tenant. The residents of all three floors were present for the beginning of the investigation.
The investigation began by splitting into two groups. The first group consisted of Brian, Jason, and Ben who did an EVP session on the third floor in Ben's room. The second group consisting of everyone else did an EVP session in the basement. The tenants of the first and second floors were playing music and speaking loudly as can be heard in the recordings.
The next phase of the investigation consisted of Zakk and Abbi doing EMF sweeps on the third floor along with an EVP session in the third floor bathroom while the rest of the group did an EVP session in the basement. Two voice recorders were set up in the basement, one on each side of the room.
Next we decided to leave both recorders in the basement as well as a stationary camera trained on an EMF detector while we went to the third floor to look at getting into the attic.
At this point in the investigation the tenants of the second floor had left, giving us the opportunity to explore the second floor. At this point we split into three groups. The first group consisting of Jason and Tom stayed downstairs and did a video sweep of the basement. Group two consisting of Brian, Ben, and Rich did EMF sweeps on the second floor while group three consisting of Abbi and Zakk went to the third floor to try and access the attic to do an EVP session. Unfortunately they were unable to access the attic, and instead did an EVP session in the third floor bathroom.
As the investigation was growing to a close, all three groups converged for an EVP session on the second floor.
2nd floor - EVP SessionJason did a final EVP session in the second floor bathroom before packing up and ending the investigation officially around 12:20 am on April 25th.
AnalysisInformation being compiled.
ConclusionInformation being compiled.
|